Login Create Account
 
Power Your Document

Flood Management In Chichester


# 2553
Flood Management In Chichester
A look at the effects of the flooding of Chichester and management techniques.
1,295 words (approx. 5.2 pages) | 2 sources | 2001 United Kingdom


Paper Summary:

A detail look at the flood management schemes on the river Chichester that flooded in 1994. The author offers a detailed analysis of the effects of the flooding and these were controlled.

From the Paper:

"In January 1994 Chichester suffered extensive flooding. The national Rivers Authority (NRA), west Sussex Council the fire brigade and other emergency services battled together against the floods that deluged the city of Chichester and the surrounding area. The flooding occurred when the river Lavant burst its banks in its upper catchment and could not be contained in the culvert, which runs underneath Chichester. As a consequence, the hornet district of the city was inundated several times and large areas to the east lay under waters for days."

Cite this paper

APA Citation:

Flood Management In Chichester (2012, January 15). Retrieved February 13, 2012, from http://www.academon.co.uk/Essay-Flood-Management-In-Chichester/2553

MLA Citation:

"Flood Management In Chichester" 15 January 2012. Web. 13 Feb. 2012. <http://www.academon.co.uk/Essay-Flood-Management-In-Chichester/2553>




ATTENTION:

Your browser does not have cookies enabled.

Our shopping cart will not function properly.
Downloadable version: £ 16.95
ADD TO CART »
You will be able to download, read and edit this file once you buy this document
Shopping Cart
Currency:
AcaDemon.com is that one place
Published by:

GB
Publisher Since:
Nov 21, 2001
Wellington College achieved 5As and 5A*s at GCSE currently taking A-levels
Seller Assistance
Share Our Success